The Journey of a CNC Component: From Idea to Finished Part
What actually happens between your order and the finished component in your hands? The manufacturing process of a CNC precision part comprises many steps — each one influences the quality of the final product.
Station 1: Material Selection and Procurement
Everything begins with the right material. Depending on requirements, aluminium, steel, stainless steel, brass or another material is selected. The stock shape (drawn or extruded) also affects quality and costs.
Station 2: Work Preparation
Drawing Analysis
The technical drawing is analysed: What tolerances, surfaces and post-treatments are required? Are there critical dimensions that need special attention?
Production Planning
The optimal process selection is made: turning, milling or a combination? How many setups are needed? Which tools are required?
Station 3: CAM Programming
In the CAM software, the CNC program is created. The programmer defines machining strategies, tool changes, cutting parameters and tool paths. A simulation checks the program for collisions and errors — before the machine starts.
Station 4: Setup and Preparation
The machine is prepared: insert and measure tools, mount clamping devices, clamp the workpiece and set the zero point. This step significantly determines the achievable accuracy.
Station 5: CNC Machining
Roughing
First, the bulk of the material is removed — with high feed rates and large depths of cut. The goal: get as close to the final contour as quickly as possible.
Finishing
Then the final contour is produced with finish passes — reduced feed rates, light depths of cut, optimal cutting speeds for the required surface quality.
Station 6: Quality Inspection
The finished component is measured: dimensions, tolerances, surface and visual quality are checked. For first articles, complete documentation of all dimensions is provided.
Station 7: Post-Treatment
Depending on requirements, post-treatments follow: deburring, anodising, hardening, coating, blasting or polishing. Each post-treatment requires specific process knowledge to preserve the preceding machining quality.
Station 8: Packaging and Shipping
Precision parts require careful packaging. Corrosion protection, shock-resistant packaging and clear labelling ensure that the component arrives in perfect condition.
Frequently Asked Questions (FAQ)
How long does manufacturing take?
With available material: 5–10 working days for one-off parts. With an express order, even faster. Series require 2–4 weeks depending on quantity.
Can I track the process?
With good manufacturing partners, yes. We proactively inform you about the production status and contact you immediately in case of deviations or delays.
Conclusion: Every Step Counts
The path from raw material to finished precision component is complex — and every single step influences the result. An experienced manufacturing partner masters all stations and consistently delivers high-quality results.